December 20, 2013

Snowmen and such

Not exactly sure how it got to be Friday, the 20th of December, already. The speed at which December has flown by has, however, not left me completely frazzled.  At least for the last day of school before Christmas vacation, I was prepared.  It was a day of high fives for mom!

Although I forgot to take a picture of the cupcakes for FBLA, my Thursday ended with 18 cupcakes frosted in white with blizzard blue and irridescent white "snow" (sugar) and candy snowflakes on top.  There was also a 2nd and 3rd pan of peppermint bark (btw, go with the Ghiradelli instead of the Hersheys; the result is a gazillion times more reliable and will likely result in far less swearing from the chef).

And, the piece de resistance, 29 snowmen in cake pop form! Some have ear muffs with white iridescent sugar hair. Some have bright blue hats with blue sugar and white candy snowflakes.  A few have a "charcoal" nose, but most have orange candy coated sunflower seeds for noses.



You know what else there was? A GIGANTIC learning curve for those cake pops.  I followed the Betty Crocker recipe for snowmen cake pops to the letter, folks.  And five hours at the kitchen counter later, I was just finishing the blue caps.  Do you know why it took so long?  Well, let me tell ya!  Betty Crocker said to use meltable candy coating, both white for the head and blue for the hats.  On closer examination of the picture that went with the recipe, Betty Crocker, however, elected to NOT FOLLOW THEIR OWN DIRECTIONS and went with the much more attractive and significantly EASIER and time-saving fondant, which was wrapped around the cake instead of trying to dip cake balls upside down on a stick into hot melted candy coating.  With fondant, you also don't have that unattractive issue of dripping or little errant cake pieces making your snowman lumpy.  Like I always say, that's what I get for following the directions! And you know what you can't find much of during the Christmas season?  Pastel circular confetti sprinkles.  I had to pick out the pink ones from the fun confetti mix. Regardless, my cake pops were the hit of the party and more than one mother gave me that look as we stood around the snack table.  You know the one.  (The one that makes you want to do your own end zone victory dance.)

But there was also the finishing of Christmas projects.  The last of Rocket's scarves is done. (And P.S., I continue to despise Sashay.)


And there was the hat for Scout #2.  The hat is the Earwarmer Hat pattern, and though my kid is more about the fashion than keeping his ears warm, that 3-inch band is double-stranded and will keep his ears warm in our just-cold-enough winter weather. He's supposed to fold up that ribbing, but I'm glad he prefers not to because the wrong side of ribbing isn't as attractive as the right side.



And after way too much time driving kids around today and the whirlwind of Scouts getting ready for a winter campout/hike this weekend in the mountains, I'm all done in for this week!  I'm down to a half-completed mobius cowl that will surely be done tomorrow and 2 pair of socks.  Movies and knitting … that will be my weekend.

Now if we could only get some snow instead of the forecast temperatures in the 70s to put me back in the winter knitting mood.  Farmers' Almanac, don't fail me now!

December 18, 2013

December Whirlwind

I think I may have, for the first time, done it.  By "it" I mean that I have gotten the Christmas cards out in time to arrive BEFORE Christmas--that almost never happens.  I have put together (it took about 4 months of canning) our first Cedar Hill Farm Company gift baskets and they are shipping out today to family and friends on literally every border of the U.S.  My Christmas shopping is DONE--two weeks earlier this year than last--and all but the few presents still to arrive (I think Bass Pro and Justice may be the SLOWEST shippers of goods in the history of the world!!!!) are wrapped, shipped, or under the tree.  The tree was up by the 5th of December this year instead of the 21st of December like last year. The lights were up by the 15th, and we even have a new mantel on which to hang out stockings.  I feel like I've won the lottery, though I didn't actually and I'm a little miffed about it right now, and this year is a definite testament to the power of "The LIST".

But for as impressive as all of the above is, the Christmas knitting spreadsheet is coming up a bit short and I am a bit stressed (ok, SUPER stressed!) about the knitting left to be finished up.  It's been coming together so much more slowly than what I had scheduled that I had to take some time to make myself a few gifts for new inspiration.  Of course, I also made about 16 new ones for my Etsy shop, too, so go check those out if you also feel the need to give yourself an inspirational knitting gift.


This was where I was yesterday:


Three pair of socks (four if you count the completely invisible one that I knit for Honey and then had to tear out completely and start over with 7 days in which to knit a pair of man socks) are finished.  Two are on their way to someone else's Christmas tree, and I wasn't bright enough to photograph them before I wrapped them.  One pair, Honey's socks, are pictured (and wouldn't you know that he wants me to tear them down to the heel to make the foot "just a little more snug"). The partially knit pair and another I've yet to cast on are for the boys, and Lady Luck is on my side because they are A) going to be gone all weekend and I can knit on them in secret on the front porch swing (going to be in the 70s?! this weekend) and B) they are going to be gone until after Christmas--that shared custody thing REALLY sucks at the holidays--so that gives me an extra week of frantic knitting.  But since I am done with all of the other prep-for-Christmas duties, all I have to do around her is clean, bake, take care of animals, and knit anyway.

A last-minute request for a wool beanie in hand-painted cadet blue and dove grey from one of the boys is pictured with the ribbing done (plus 5 inches of invisible knitting because the pattern was a little small for his big head and I've had to re-group).

One pair of Urbanista Gloves in hand-painted BFL for my mother-in-law, finished.

One 54-inch mobius cowl cast on and begun for the step-daughter (I'm loosely following a pattern but does that little circle of red really look like it's going to be 54 inches?!). The thing about mobius knitting is that you never really know what it's going to look like until you cast off.  I will be knitting nervously all the way.


One ruffle scarf begun in black/silver for Rocket (raise your hand if you HATE fake knitting with SASHAY as much as I do!), one already finished (pictured), and one bulky Tunisian crochet scarf in pink heathered with turquoise and purple finished.  This last ruffle Whew!

And I should be knitting instead of blogging, so see ya! May your hands be swift and your last-minute Christmas knitting be done before Christmas!

December 05, 2013

Back to Square One: A Sock Drama

I keep reminding myself that there is no crying in knitting because it is, after all, not the end of the world if you make a careless mistake or, say, two weeks of careless knitting mistakes.  Those man socks … the pair that I am (was) knitting for my Honey … let's just say the adventure is gone and now it's just a matter of stubborn knitting to meet the deadline.

I'm not really sure what possessed me to knit all the way to the toe decreases before it occurred to me to have my Honey try them on, even under the guise of them being someone else's gift.  I'm not sure why I elected to follow someone else's pattern and then not check after the initial ribbing to see if I was getting gauge.  I'm not sure why I didn't double-check the CO math against the gauge.  But I will say this about a pair of socks that are now back to pre-cast on stage:  If we had a Yeti that needed a pair of thick, warm socks, they would have been smashing!


So it's back to the drawing board.  This time, before I ripped out 3 hours here, an entire Saturday afternoon of heels and 2 weeks there, I measured my gauge so that I could calculate a realistic cast on number for the next time I cast on, which really needs to be in about 3 minutes because I now have exactly 10 days to re-knit a pair of man socks.  The other pair on the needles is going to have to be ripped out, too.  Although I did use my brain enough to take down the cast on number by 8 stitches (1 inch, gauge-wise) on the other pair because I was using a less heavy yarn, on closer inspection it turns out that I'm still coming up with about 1.5 inches too much in the leg width (which will translate to a behemoth heel later on) and that's just not something I can decrease out. There are many expletives floating around in my brain at the moment that I won't share here, but the reality is that this is all my fault.  I was so focused on the deadline and my knitting schedule to hit the finish line with an record-setting amount of last-minute knitting done that I carelessly disregarded ALL of the rules of knitting.  Let that be a lesson to you.  Honor The Rules.



And the icing on the cake to all of this is that while removing the needles from the socks to rip them, one end of the fixed cable detached itself from a needle and now I'm down a pair of circs. Crap.

Translate

Search This Blog